Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
8 Bình luậns
Hamden, CT (Chính thức đã xác nhận)
Được thừa nhận Staff Engineer (Chính thức đã xác nhận)
previous request #4898669
We previously have shown work being completed under this previous SCF.
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.