Description
Sidewalk corner of 59 Leo Rd and Lovell Street. The sidewalk cement has broken up in different sections. Concerns for neighbors who are walkers on this sidewalk all the times. It's going to get worse and it will become a hazard. Please repair ASAP.
3 Comments
Hamden, CT (Verified Official)
Acknowledged Staff Engineer (Verified Official)
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
This site is on our Master List for repairs since 2017. We will reevaluate.
Engineering Inspector (Verified Official)