Beschreibung
The plastic supports around the train crossing at Cambridge street have really broken down now, cars are bottoming out
The plastic supports around the train crossing at Cambridge street have really broken down now, cars are bottoming out
5 Kommentierens
City of Cambridge (Verifizierter Beamter)
Anerkannt City Hall – DR (Verifizierter Beamter)
City Hall – DR (Verifizierter Beamter)
City Hall – DR (Verifizierter Beamter)
Geschlossen City Hall – DR (Verifizierter Beamter)
Keolis will be working to replace the railroad crossing on Cambridge Street this Friday, October 29 into Saturday, October 30. The work will require a full shutdown of all traffic on Cambridge street at the crossing location. Work will entail removing the section of railroad tracks that cross Cambridge street, installing new roadway sub-base, and establishing a new at grade railroad crossing.
This work will be performed overnight and has received approval from the licensing commission. The start time will be 11:00pm on Friday, October 29 and will be finished mid afternoon on Saturday October, 30. This allows time for the asphalt to cool before opening up to traffic. There will be two detour route options to the North and to the South. More information and a detour map is available at https://www.cambridgema.gov/Departments/publicworks/news/2021/10/cambridgestreetrailroadcrossingclosureoctober29intooctober30