الوصف
Per understanding from the City of Dunwoody Public Works Department, Perimeter Center Place was scheduled to be striped for Bike Lanes as part of the resurfacing/paving project. The road has been re-paved with the last few days. There are "temporary" / hashed lane markings that show the OLD configuration -- 2 travel lanes each direction. What has been communicated is that this segment would be changed to: a) Center Turn Lane; b) one motor vehicle travel lane in each direction; c) Bike Lanes on both sides.
5 تعليقs
تم إقراره Dunwoody Public Works (مستخدم مسجل)
Dunwoody Public Works (مستخدم مسجل)
Joe Seconder (مستخدم مسجل)
Dunwoody Public Works Manager (تم التحقق رسميا)
مغلق Dunwoody Public Works Manager (تم التحقق رسميا)