Re-Striping Needs Bike Lanes La Kaydiiyey

Perimeter Center Place Dunwoody, Georgia Ka Muuji Khariidadda Qari Khariidadda
Move the marker to represent your issue's location. The address will not change.

Wariyaha

Bixi Aqoonsiga:

1208466

Submitted To:

Dunwoody Other

Category:

Other

Arkay:

1665 jeer

Xaafadda:

Dunwoody

La sheegay:

kusaabsan/saaran

Sharraxaadda

Per understanding from the City of Dunwoody Public Works Department, Perimeter Center Place was scheduled to be striped for Bike Lanes as part of the resurfacing/paving project. The road has been re-paved with the last few days. There are "temporary" / hashed lane markings that show the OLD configuration -- 2 travel lanes each direction. What has been communicated is that this segment would be changed to: a) Center Turn Lane; b) one motor vehicle travel lane in each direction; c) Bike Lanes on both sides.


5 Faalladas

  • La qiray Dunwoody Public Works (Isticmaale Diiwaangashan)

  • Dunwoody Public Works (Isticmaale Diiwaangashan)

  • Joe Seconder (Isticmaale Diiwaangashan)

  • Dunwoody Public Works Manager (La Caddeeyey Rasmi ah)

  • La xidhay Dunwoody Public Works Manager (La Caddeeyey Rasmi ah)

Faallooyinku waxay u xidhan yihiin arrimaha kaydsan.