Construction Issue - Sidewalk Blocked تم حفظه في الأرشيف

519-525 Lake Park Ave Oakland, CA, 94610, USA عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

12541401

فئة:

Construction Issue - Sidewalk Blocked

شاهدوا:

232 مرات

حي:

Lakeshore

ذكرت:

في

خدمة طلب ID:

1214331

الوصف

A contractor apparently working on the EVgo charging station project abandoned these boards and a traffic barricade. They're just to the right of the Lake Park Avenue parking lot entrance.

سئل أيضا...
Q. How long has the construction material been there?
A. 3-4 months
Q. How much of the sidewalk is obstructed?
A. The sidewalk is not obstructed but I couldn't find a more appropriate category.
Q. Is the material covered?
A. No
Q. Is the material located near a storm drain inlet?
A. No
Q. Can you identify the company doing the construction work?
A. The barricade is stamped CRI but I couldn't identify the actual company.

2 تعليقs

التعليقات مغلقة لقضايا المؤرشفة.