What is the plan for the even side of cliff street? It is November 18th and the contractor has not even started the sidewalk.
What is the plan for the even side of cliff street? It is November 18th and the contractor has not even started the sidewalk.
6 Bình luậns
Malden, MA (Chính thức đã xác nhận)
Robert P. Knox Jr. (Director of Public Works) (Chính thức đã xác nhận)
Malden, MA (Chính thức đã xác nhận)
Được thừa nhận Yem Lip (Director of Engineering) (Chính thức đã xác nhận)
JF (Người dùng đã đăng ký)
Đã đóng Robert P. Knox Jr. (Director of Public Works) (Chính thức đã xác nhận)
Cliff Street road and sidewalks are complete
Thanks
Bob Knox Jr.
Director