Mas magaling ang SeeClickFix kasama ang mga kalapitbahay
Imbitahan ang iyong mga kapitbahay at kaibigan na gamitin ang SeeClickFix upang sila ay makapagpahayag, makaboto at makapagkomento tungkol sa mga isyu sa inyong lugar at lungsod.
Thank you for contacting us about your concern. The section of I-215 between 4700 South and SR-201 is rough. We have worked to keep the roadway in as good of shape as possible over the years, however the pavement in this area has reached the end of its life. We are currently designing a project to rebuild the pavement in this area and expect to begin pavement reconstruction in the spring of 2016. In the meantime, we will continue to refill potholes as they appear. If there are specific areas that we have missed please let us know, the temperature and winter moisture cause the patches to fail sooner than those we install under better conditions.
5 Komentos
Becky - UDOT Communications (Beripikadong Opisiyal)
Becky - UDOT Communications (Beripikadong Opisiyal)
Kinilala UDOT Region 2 (Beripikadong Opisiyal)
UDOT Region 2 (Beripikadong Opisiyal)
Isinara Ashlee - UDOT Region 2 Operations (Beripikadong Opisiyal)