Descrizione
for over 15 years, this street across from City Hall has numerous size and depth potholes neglected from repairs.
In 2016, it appear a small part of it was fixed....but the entire street is BAD, bad, BAD and needs serious fixing.
ha chiesto inoltre...
D. What direction of travel is affected by this pothole?
R. Unsure
R. Unsure
11 Commentos
Coco (Utente registrato)
Homeowner (Utente registrato)
Justine (Utente registrato)
Justine (Utente registrato)
Riconosciuto Justine (Utente registrato)
Brant, Engineering (Ufficialità verificata)
Greetings!
Update: The Capitol Street Road Rehabilitation Project is currently in design. The City of Vallejo estimates the start of construction to begin in summer 2020. If anything changes, I will update this page.
Brant, Engineering (Ufficialità verificata)
Brant, Engineering (Ufficialità verificata)
Brant, Engineering (Ufficialità verificata)
Brant, Engineering (Ufficialità verificata)
Chiusa Brant, Engineering (Ufficialità verificata)