الوصف
Failure of erosion control tubes. Catch basin plugged with sediments. Traveled portion of street with loose aggregate and tubing washed down Maple St.
Failure of erosion control tubes. Catch basin plugged with sediments. Traveled portion of street with loose aggregate and tubing washed down Maple St.
5 تعليقs
Permitting and Inspections (تم التحقق رسميا)
تم إقراره DPW Pine Customer Service (تم التحقق رسميا)
Water Resources Customer Service (تم التحقق رسميا)
Water Resources Infrastructure Asset Manager (Inactive) (مستخدم مسجل)
مغلق Stormwater Program Manager (تم التحقق رسميا)