Description
Failure of erosion control tubes. Catch basin plugged with sediments. Traveled portion of street with loose aggregate and tubing washed down Maple St.
Failure of erosion control tubes. Catch basin plugged with sediments. Traveled portion of street with loose aggregate and tubing washed down Maple St.
5 Commentaires
Permitting and Inspections (Membre officiel vérifié)
Reconnu DPW Pine Customer Service (Membre officiel vérifié)
Water Resources Customer Service (Membre officiel vérifié)
Water Resources Infrastructure Asset Manager (Inactive) (Utilisateur inscrit)
Clos Stormwater Program Manager (Membre officiel vérifié)