说明
This lot was clear cut, leveled out, retaining wall built on the west side, large limerocks on the south side, and limerock edging right up against the creek. A small building was built on the property. Never have we seen any construction permits posted. Not sure if this is a sediment problem but should there not be a buffer next to the creek?
还问了...
问 Are there erosion control Practices in place?
答 没有给出答案
答 没有给出答案
8 评论s
ACC Admin (注册用户)
Concerned neighbor (注册用户)
Lucyspin (注册用户)
Nary (注册用户)
Alachua County Environmental Protection (注册用户)
Lucyspin (注册用户)
已确认 Alachua County Environmental Protection (注册用户)
Thank you for your concern on this issue. ACEPD staff are following up with the property owners to address erosion and sedimentation that occured following the storm on 2/6. Staff are working with the owners to stabilize the site and to prevent further erosion and sedimentation of the adjacent creek bed and stormwater systems. If you have any specific concerns or questions feel free to contact the Water Resources group at 352-264-6800.
The City of Gainesville is reviewing the permitting status of the work on the property. For more information on this status contact City of Gainesville Environmental Coordinator Liliana Kolluri at 352-393-8188.
关闭 Alachua County Environmental Protection (注册用户)