Deskripsyon
Both sides of the street are blocked for pedestrians due to construction. This is a big problem for people walking and ADA.
Both sides of the street are blocked for pedestrians due to construction. This is a big problem for people walking and ADA.
14 Komentos
City of Cambridge (Beripikadong Opisiyal)
Nico (Rehistradong User)
Public Works - TS (Streets & Sewers) (Beripikadong Opisiyal)
Kinilala Public Works - PA (Inspections) (Beripikadong Opisiyal)
Public Works - PA (Inspections) (Beripikadong Opisiyal)
Public Works - PA (Inspections) (Beripikadong Opisiyal)
afo3666 (Rehistradong User)
Batman (Rehistradong User)
Batman (Rehistradong User)
Public Works - PA (Inspections) (Beripikadong Opisiyal)
-contractor install new sidewalks and ada pads on Plymouth at Berkshire and temp asphalt on Vandine at Berkshire. All work should be complete this week.
Isinara Public Works - PA (Inspections) (Beripikadong Opisiyal)
afo3666 (Rehistradong User)
afo3666 (Rehistradong User)
afo3666 (Rehistradong User)