Nothing's been done to clear the rocks along the base of the wall and the remove the cones, let alone repair the wall. The more rain we get, the worse the problem will become...
It's been 45 days and the property owner has done nothing to fix this. The rocks are still on the sidewalk along the wall and the cones are still there. Please enforce.
This an expensive undertaking. The Engineer is just now completing the plans for submittal and review for permitting. The weather has not been optimal for a repair of this type.
Chris Webb
Dir. Permits, Inspections & Planning Services
Agree with Jamie. In the fall, this same area has an abundance of slippery leaves. Regardless of the expense, it is the responsibility of the property owner to ensure this gets fixed. This is a major approach to Oak Grove station.
How much longer until this is repaired? Now the weeds are overgrown and so even less of the sidewalk is usable. The homeowner fails to take care of weeds, and in the fall, leaves, every year and now the wall has been collapsed for 6 months with no repair.
There is barely enough cleared sidewalk for one person thanks to uncollected leaves and overgrown weeds from the summer, not to mention the fallen rocks that have been sitting there for close to a year! Please deal with this. Pedestrians deserve clear and safe sidewalks. We pay taxes too!
A year ago, this was explained: "This an expensive undertaking. The Engineer is just now completing the plans for submittal and review for permitting. The weather has not been optimal for a repair of this type."
22 تعليقs
City of Malden (تم التحقق رسميا)
Resident (ضيف)
It's on the north side of the street -- property owner is 7 Glenwood Ave.
The entire sidewalk is not blocked.
Malden 311 (Constituent Services Representative) (تم التحقق رسميا)
Malden 311 (Constituent Services Representative) (تم التحقق رسميا)
Jamie (مستخدم مسجل)
Christopher Webb (Director of Public Health) (تم التحقق رسميا)
Jamie (مستخدم مسجل)
Jamie (مستخدم مسجل)
Christopher Webb (Director of Public Health) (تم التحقق رسميا)
This an expensive undertaking. The Engineer is just now completing the plans for submittal and review for permitting. The weather has not been optimal for a repair of this type.
Chris Webb
Dir. Permits, Inspections & Planning Services
Jamie (مستخدم مسجل)
Ken M (مستخدم مسجل)
Jamie (مستخدم مسجل)
Resident (مستخدم مسجل)
Jamie (مستخدم مسجل)
Christopher Webb (Director of Public Health) (تم التحقق رسميا)
Jamie (مستخدم مسجل)
Ken M (مستخدم مسجل)
Jamie (مستخدم مسجل)
مغلق Joseph O’Callaghan (Permits, Inspections and Planning) (مستخدم مسجل)
فتح Jamie (مستخدم مسجل)
Jamie (مستخدم مسجل)
A year ago, this was explained: "This an expensive undertaking. The Engineer is just now completing the plans for submittal and review for permitting. The weather has not been optimal for a repair of this type."
Why has nothing been done still?
Thanks!
مغلق Jamie (مستخدم مسجل)