Beschreibung
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
8 Kommentierens
SCormier (Verifizierter Beamter)
Anerkannt SCormier (Verifizierter Beamter)
Display Name Blocked (1384260) (Registrierter Benutzer)
IT Department (Verifizierter Beamter)
SCormier (Verifizierter Beamter)
SCormier (Verifizierter Beamter)
Display Name Blocked (409268) (Registrierter Benutzer)
Geschlossen DPW Engineering LW (Verifizierter Beamter)
Significant patching completed in 2019 to address concerns listed.
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.