Description
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
Please do not close this issue until the road is repaved. Potholes have been reported multiple times. The cold patch is not holding up at all, entire road needs to be repaved.
8 Comments
SCormier (Verified Official)
Acknowledged SCormier (Verified Official)
Display Name Blocked (1384260) (Registered User)
IT Department (Verified Official)
SCormier (Verified Official)
SCormier (Verified Official)
Display Name Blocked (409268) (Registered User)
Closed DPW Engineering LW (Verified Official)
Significant patching completed in 2019 to address concerns listed.
The Department of Public Works has resolved this request. Thanks for helping to keep Burlington a great place to live and work.