This is new construction and the street lights need to be installed by the Developer/PSE&G. A request was sent to bolt cones to the foundations until the lights are installed.
The developer is currently working on the final roadway construction and new lighting will be installed as part of the work. It will be completed later this year. Thank you.
12 تعليقs
erik (مستخدم مسجل)
RRC <small class="fwn">(تم التحقق رسميا)</small>
Commerce - Vishaul (مستخدم مسجل)
Commerce - Vishaul (مستخدم مسجل)
تم إقراره Engineering - Drew B (تم التحقق رسميا)
erik (مستخدم مسجل)
Engineering - Drew B (تم التحقق رسميا)
erik (مستخدم مسجل)
مغلق RRC - Kirkland (تم التحقق رسميا)
فتح RRC - Kirkland (تم التحقق رسميا)
RRC Assistant Director - Waseem (تم التحقق رسميا)
مغلق Engineering - Drew B (تم التحقق رسميا)