Descrição
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
Street and sidewalk were damaged as part of gas line repairs. Replacement of the damaged area was scheduled in September but due to bad weather was never carried out
4 Comentários
Reconhecido DC 311 (Utilizador Registado)
Fechado DC 311 (Utilizador Registado)
Reopened SCain (Utilizador Registado)
Reconhecido DC 311 (Utilizador Registado)