Descripción
Future wheelchair ramp work, road resurfacing and paving planned for September 2020.
Limits of work: Henry Street to Ferry Street
Future wheelchair ramp work, road resurfacing and paving planned for September 2020.
Limits of work: Henry Street to Ferry Street
5 Comentars
Malden, MA (Oficial verificado)
Yem Lip (Director of Engineering) (Oficial verificado)
Yem Lip (Director of Engineering) (Oficial verificado)
Yem Lip (Director of Engineering) (Oficial verificado)
Cerrado Yem Lip (Director of Engineering) (Oficial verificado)