Plumbing problems / Sewage back-ups Arquivada

298 Cape Saint John Road Annapolis, MD Mostrar no mapa Esconder Mapa
Mova o marcador para representar a localização da sua solicitação. O endereço não vai mudar.
Ok

Solicitante

Número da Solicitação:

3398830

Submitted To:

Housing/Health Issues

Category:

Plumbing problems / Sewage back-ups

Visto:

1093 vezes

Bairro:

Parole

Relatada via:

http://www.aacounty.org

Relatada:

em

Duplicado por:

3400102

Descrição

The ongoing delayed operations to complete the new sewage pumping station are running loud electric generators and disturbing the peace in the surrounding neighborhood. It seems that the system could be powered by silent BGE power that is readily available. Why not? The result has long since become intolerable and something needs to be done to reduce the noise pollution being emitted by this operation.

I'm a member of the Cape St. John Civic Association and I request an answer to my question above and an explanation of how this will be addressed. I'm at 443-254-4712 all the time.

também perguntou...
Q. Is this an apartment, rooming house, or hotel?
A. No
Q. Is sewage overflowing at the grinder pump, Mayo tank or house connection?
A. No

7 Comentários

  • Anne Arundel County Admin (Oficial Verificado)

  • Encerradas Sue Raupuk (Oficial Verificado)

  • Sue Raupuk (Oficial Verificado)

  • Reaberta ThosEM (Utilizador Registado)

  • Admin 3 - KBD (Oficial Verificado)

  • Sue Raupuk (Oficial Verificado)

  • Encerradas BOH SD (Oficial Verificado)