Description
Just 2 days ago a McVac truck spent all day cleaning the drainages along Main St., between Castle St. and Alton St.
Two thinks:
- they didn’t do the job correctly or
- this area needs a major work to repair it.
Whichever is the solution, needs to be done ASAP. Safety hazard for pedestrians and school students. This is a school bus students pick up zone.
1 Comment
Closed City of New Haven Engineering Department - Project Coordinator (Verified Official)